During the Preliminary Assessment the following research activities were carried out:
- MV ESTONIA Wreck Site Bathymetric Comparison Seabed Changes from 1994–2024
- Numerical and experimental assessment of the collapse loads of the windows of MV ESTONIA
- Numerical Simulation and Analysis of the Sinking Scenarios of MV ESTONIA
- MV ESTONIA: Numerical assessment of the midship damages with revised material properties, vessel position and orientation
- Geological units at the MV ESTONIA wreck site summary of acquired sub-surface imaging data
- MV ESTONIA Numerical modelling of bow arrangement failure sequence
- Bow visor of MV ESTONIA location after detachment as illustrated in reports and data
- MV ESTONIA wreck site environmental data overview and illustrations of acquired datasets